What this work involves
Start with available height, subfloor and finish. Not every floor is suitable for cutting channels. Coordinate the system and controls for each room.
- Heat demand and source
- Floor suitability
- System and height
- Manifold, controls and routes
- Finish and commissioning
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate the internal floor, skirting and glazing threshold levels.
What the drawing needs to explain
Draw one section through the kitchen, glazing and terrace. Include finished floor levels, the roof edge and shading position; separate supplier sketches do not fully show these relationships.
How to review the result
At completion, walk from the cooking area to the terrace. Check the opening with the intended furniture in place and review the light with any shading closed.
Cost factors for this service
System, area, repairs and installation changes influence the price.
Bring this to the discussion
Plans, heat source, floor construction and finish preference.
Questions about the work
Is every floor suitable?
Structure, height, finish and heating demand must be compatible. The heating and flooring specialists should coordinate their requirements.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

