What this work involves
Check flatness, moisture and available height. Flooring affects doors, skirting, stairs and heating. Coordinate these junctions before ordering.
- Substrate and preparation
- Heights and transitions
- Material and use
- Underfloor heating coordination
- Skirting, thresholds and maintenance
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate the internal floor, skirting and glazing threshold levels.
What the drawing needs to explain
Draw one section through the kitchen, glazing and terrace. Include finished floor levels, the roof edge and shading position; separate supplier sketches do not fully show these relationships.
How to review the result
At completion, walk from the cooking area to the terrace. Check the opening with the intended furniture in place and review the light with any shading closed.
Cost factors for this service
Removal, repairs, levelling, material and details determine the total.
Bring this to the discussion
Photographs, known floor construction and measurements at doors and transitions.
Questions about the work
Can a new floor go over the existing one?
It depends on stability, moisture, adhesion, height and system requirements. Have the substrate assessed first.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

