What this work involves
Assess heat loss, emitters, electricity supply, sound and placement together before selecting equipment.
- Hybrid or all-electric approach
- Indoor and outdoor space
- Emitters, hot water and controls
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Keep controls and connection points outside the sliding door movement zone.
Decide this before construction
Fix the kitchen layout and finished floor levels before ordering services and glazing. Plan the outdoor transition too, even when garden work will follow later.
Allow for later maintenance
Keep glazing and rooflight maintenance instructions together. Leave outdoor surfaces accessible without having to remove permanent furniture or planting.
Cost factors for this service
Costs depend on system type, building adaptations, placement and commissioning. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for heat pumps & heating adaptations. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging heat pumps & heating adaptations?
A product name or floor area is not a complete sizing assessment. A suitable proposal describes assumptions and required adaptations.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

