What this work involves
Assess structural function, deterioration and connections. Coordinate exposed and concealed elements with the structural design.
- Member layout and connections
- Exposed or concealed finish
- Connections to the existing building
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate the structure with the proposed opening to the garden.
What the drawing needs to explain
Draw one section through the kitchen, glazing and terrace. Include finished floor levels, the roof edge and shading position; separate supplier sketches do not fully show these relationships.
Decide this before construction
Fix the kitchen layout and finished floor levels before ordering services and glazing. Plan the outdoor transition too, even when garden work will follow later.
Cost factors for this service
Costs depend on spans, timber selection, repairs and installation. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for timber structures & joists. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging timber structures & joists?
An exposed beam needs different finishing agreements from a concealed structure. Record this before materials are ordered.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

