What this work involves
Clarify whether walls will be painted, papered or decoratively finished. Substrate, cracks and grazing light affect the result. Coordinate installations, drying and subsequent work.
- Substrate assessment
- Required finish level
- Corners and reveals
- Drying and sequencing
- Protection and cleaning
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate the internal floor, skirting and glazing threshold levels.
What the drawing needs to explain
Draw one section through the kitchen, glazing and terrace. Include finished floor levels, the roof edge and shading position; separate supplier sketches do not fully show these relationships.
How to review the result
At completion, walk from the cooking area to the terrace. Check the opening with the intended furniture in place and review the light with any shading closed.
Cost factors for this service
Area, substrate, thickness and detail work influence the price.
Bring this to the discussion
Wall and ceiling photographs, areas and intended finish.
Questions about the work
When can new plaster be painted?
When it is sufficiently dry and suitable for the chosen paint system. Material, thickness and conditions affect the time.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

