What this work involves
Separate what the plot allows from what you need in everyday life. A schedule of rooms helps coordinate architecture, building services and finishes from the beginning.
- Requirements and plot information
- Design, structure and investigations
- Construction system and materials
- Heating, energy use and ventilation
- Finishes, landscaping and handover documents
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Include lighting in the retained room when adding floor area.
Which trade-off matters?
A wide garden opening takes away wall space for cupboards. Compare a fully glazed rear wall with a smaller opening and a targeted rooflight, looking at both from the same seat.
What the drawing needs to explain
Draw one section through the kitchen, glazing and terrace. Include finished floor levels, the roof edge and shading position; separate supplier sketches do not fully show these relationships.
Decide this before construction
Fix the kitchen layout and finished floor levels before ordering services and glazing. Plan the outdoor transition too, even when garden work will follow later.
Cost factors for this service
A complete budget includes more than the construction price. Keep design, investigations, connections, authority fees, landscaping and finishing choices visible.
Bring this to the discussion
Plot information, room requirements, existing drawings, preferred timing and budget priorities.
Questions about the work
When does a budget become reliable?
When the design, technical assumptions and finish level are sufficiently defined. Early estimates remain dependent on assumptions and provisional sums.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.