What this work involves
Define the purpose, size and position. Establish structural suitability and possible services before work. Water, dust and removal of cut sections belong in the preparation.
- Opening and material build-up
- Structural assessment where needed
- Service and reinforcement checks
- Access and protection
- Water, dust and waste handling
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate the structure with the proposed opening to the garden.
What the drawing needs to explain
Draw one section through the kitchen, glazing and terrace. Include finished floor levels, the roof edge and shading position; separate supplier sketches do not fully show these relationships.
Decide this before construction
Fix the kitchen layout and finished floor levels before ordering services and glazing. Plan the outdoor transition too, even when garden work will follow later.
Cost factors for this service
Diameter, depth, material, reinforcement and access affect execution. Include protection and disposal.
Bring this to the discussion
Dimensioned drawing, position, photographs and structural information.
Questions about the work
Can an opening be made anywhere in a concrete floor?
No. The floor's function and the position of reinforcement and services need assessment. An engineer can advise on suitable alterations.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

