What this work involves
Do not disturb suspect material. Establish the survey, notifications and qualified contractors required for the particular situation.
- Survey report
- Scope and qualified contractor
- Clearance and subsequent scheduling
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Use the section towards the garden as a shared drawing for specialists.
What the drawing needs to explain
Draw one section through the kitchen, glazing and terrace. Include finished floor levels, the roof edge and shading position; separate supplier sketches do not fully show these relationships.
Decide this before construction
Fix the kitchen layout and finished floor levels before ordering services and glazing. Plan the outdoor transition too, even when garden work will follow later.
Compare the complete intervention
Compare the glazing, rooflight and terrace reinstatement together in the budget. If a cheaper door system requires a different floor build-up, include that consequence in the same comparison.
Cost factors for this service
Costs depend on investigation, material type, access and removal scope. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for asbestos surveys & removal planning. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging asbestos surveys & removal planning?
The required process depends on materials and work. No in-house asbestos certification is claimed; the appointed specialist must be confirmed beforehand.
Official background: Dutch Government (Dutch).
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

