What this work involves
Review wall, roof-edge and chimney junctions and consider how different materials come into contact.
- Material and appearance
- Connections and movement
- Maintenance access
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Compare glazing, shading and roof openings as one part of indoor comfort.
What the drawing needs to explain
Draw one section through the kitchen, glazing and terrace. Include finished floor levels, the roof edge and shading position; separate supplier sketches do not fully show these relationships.
Allow for later maintenance
Keep glazing and rooflight maintenance instructions together. Leave outdoor surfaces accessible without having to remove permanent furniture or planting.
Which trade-off matters?
A wide garden opening takes away wall space for cupboards. Compare a fully glazed rear wall with a smaller opening and a targeted rooflight, looking at both from the same seat.
Cost factors for this service
Costs depend on length, bespoke fabrication, material choice and access. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for lead, zinc & copper work. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging lead, zinc & copper work?
Match the detail to its use. Replacing one piece will not resolve an entire junction that directs water incorrectly.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

