What this work involves
Define whether the work solves storage, circulation or finishing. Include operation, maintenance and access to services. Final measurement should follow reliable building dimensions.
- Function and arrangement
- Material and finish
- Fittings and lighting
- Floor, wall and ceiling connections
- Measuring and installation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate the internal floor, skirting and glazing threshold levels.
What the drawing needs to explain
Draw one section through the kitchen, glazing and terrace. Include finished floor levels, the roof edge and shading position; separate supplier sketches do not fully show these relationships.
How to review the result
At completion, walk from the cooking area to the terrace. Check the opening with the intended furniture in place and review the light with any shading closed.
Cost factors for this service
Material, fittings, detail and installation determine the price.
Bring this to the discussion
A sketch, photographs, approximate dimensions and the intended function.
Questions about the work
When can bespoke work be measured?
When the relevant dimensions are reliable. Allow for floor and plaster finishes still to be added.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

